didn't do a whole lot over the weekend, but did get some detail things together
-new master cylinder
-changed engine oil
-fill the ax-15 (was like a qt low

)
-d300 is still over-full n clean, so let it leak!
-cleaned up both frozen drive shaft slip yokes, for the shake down i'll just splice in tube to make them longer. also pulled the 1310 shaft off the shelf from the TJ before i went 1350, it's like brand new. it's maybe 1" to long, so i'll keep the smaller old shaft for a spare.
-front 40s are mounted on the wheels
-installed the traction bar
-installed UTV rear view mirror that clamps to the cage
and cleaned the shop, that always feels good.